Concrete slabs now laid, with SVP's (soil vent pipes) and drain pipes in position.
Steve is taking no chances with the damp proofing course. The builders have put in 3 DPC's at different levels, which is great news for us. It's another indication of a good quality build.
Three steels have been erected, so we can now see how high the ground floor ceilings are going to be. The builders are also beginning to position the internal blockwork, delineating the layout of the rooms. The build is slowly starting to come alive!
Framework shows where the windows and doors will be and the bricks are laid around these, so that later on the actual windows and doors can be installed in these spaces.
No comments: